All Issue

2019 Vol.29, Issue 6 Preview Page

Case Study

31 December 2019. pp. 394-406
Abstract
References
1
An, M.S., 2011, A study of advanced rate under the operating conditions of EPB shield TBM based on TBM operation data, Journal of Korean Civil Engineering, Vol. 31, No. 6, pp. 839-848.
2
Du, W. and Pan T.C., 2016, Site response analyses using downhole arrays at various seismic hazard levels of Singapore, Soil Dynamics and Earthquake Engineering, Vol. 90, pp. 169-182.
10.1016/j.soildyn.2016.08.033
3
Farrokh, E., 2018, Introducing hard rock TBMs' downtime analysis model with reference to past case histories' data, Journal of Mining & Environment, Vol. 9, No. 2, pp. 457-472.
4
Jeong, H.Y., Zhang, N., Jeon, S.W., 2018, Review of technical issues for shield TBM tunneling in difficult grounds, Tunnel and Underground Space, Vol. 28. No. 1, pp. 1-24.
5
Jung, S.M., Lee, K.H., Park, JH., Lee, IM., 2014, Correlation between the EPB shield TBM machine data and the ground condition, Journal of Korean Tunnelling and Underground Sp Assoc, 16(6), 543-552.
10.9711/KTAJ.2014.16.6.543
6
Sousa, R.L. and Einstein, H.H. 2012, Risk analysis during tunnel construction using bayesian netwarks: porto metro case study, Tunnelling and Underground Space Technology, Vol. 27, pp. 86-100.
10.1016/j.tust.2011.07.003
7
Yoon, Y.M., Jeong, H.Y., Jeon, S.W., 2018, Review of pre-grouting methods for shield TBM tunneling in difficult grounds, Tunnel and Underground Space, Vol. 28, No. 6, pp. 528-546.
Information
  • Publisher :Korean Society for Rock Mechanics and Rock Engineering
  • Publisher(Ko) :한국암반공학회
  • Journal Title :Tunnel and Underground Space
  • Journal Title(Ko) :터널과 지하공간
  • Volume : 29
  • No :6
  • Pages :394-406
  • Received Date : 2019-12-10
  • Revised Date : 2019-12-16
  • Accepted Date : 2019-12-17