All Issue

2019 Vol.29, Issue 5

Technical Note

31 October 2019. pp. 281-291
Abstract
References
1
Kim, K.H., Kim, H., Mun, C.H., Kim, Y.H., Kim, D.H., Lee, J.Y., 2017, “A study on the establishment of domestic criteria through analysis of shield TBM requirements in overseas ITB (Invitation to Bid)”, Journal of Korean Tunnelling and Underground Association, Vol. 19, No. 6, pp. 985-997.
2
Korea Rail Network Authority, 2012, Incheon International Airport 2nd Passenger Terminal Connection Railway of Construction work, Invitation to Bid.
3
LTA (Land Transport Authority), 2016, Tunnel Machine, General Specification, Appendix P, Circle Line Stage 6 (CCL6) Mainline.
4
MTR Corporation Limited, 2011, Contract 1109 - Particular Specification, Tunnel Boring Machine(TBM) and Lining (APPRENDIX AX).
5
MTR Corporation Limited, 2011, Geotechnical Baseline Report (Revision C), Shatin to Central Link, Detailed Design for Sung Wong Toi to Ho Man Tin.
6
Seoul City Urban Railway Development (2009), Seoul Subway Corporation Line 9 of Construction work, Invitation to Bid.
Information
  • Publisher :Korean Society for Rock Mechanics and Rock Engineering
  • Publisher(Ko) :한국암반공학회
  • Journal Title :Tunnel and Underground Space
  • Journal Title(Ko) :터널과 지하공간
  • Volume : 29
  • No :5
  • Pages :281-291
  • Received Date : 2019-09-23
  • Revised Date : 2019-10-10
  • Accepted Date : 2019-10-14